资源类型

期刊论文 218

会议视频 8

年份

2024 1

2023 23

2022 28

2021 17

2020 14

2019 13

2018 20

2017 17

2016 11

2015 14

2014 4

2013 4

2012 8

2011 9

2010 4

2009 4

2008 6

2007 6

2006 2

2005 6

展开 ︾

关键词

可持续发展 8

水资源 5

资源化利用 5

固体废物 4

中国 3

天然气 3

云制造 2

农业水资源 2

农业资源 2

分布式优化 2

分类 2

制约因素 2

发展战略 2

地位 2

工程管理 2

战略研究 2

环境 2

资源 2

资源潜力 2

展开 ︾

检索范围:

排序: 展示方式:

Planning projects with scarce resources: Yesterday, today and tomorrow’s research challenges

Mario VANHOUCKE

《工程管理前沿(英文)》 2018年 第5卷 第2期   页码 133-149 doi: 10.15302/J-FEM-2018088

摘要: This paper is an invited request to describe the main research challenges in the domain of resource-constrained project scheduling. The paper is split up in three parts. In today’s challenges, research endeavors that have received a significant, but still not enough, attention have been described. In tomorrow’s research challenges, some promising research avenues for future research have been given. Finally, in yesterday’s challenge, a research topic that started decades ago, is said to have still a huge potential in tomorrow’s research agenda. This paper does not intend to give a full literature overview, nor a summary of all possible research paths. Instead, it is inspired from the author’s experience in academic research and practical consultancy and it serves as a personal opinion on a non-exhaustive set of promising research avenues, rather than giving a full literature-based advice for future research directions.

关键词: project management     project scheduling     resource constraints     PERT/CPM     RCPSP    

基于水资源约束的我国城市发展策略研究

吴志强,刘晓畅,刘琦,乔壬路,刘治宇,杨婷,严娟,姬凌云

《中国工程科学》 2022年 第24卷 第5期   页码 75-88 doi: 10.15302/J-SSCAE-2022.05.010

摘要:

水资源是城市发展的基础性自然资源和战略性经济资源,是城市生态环境的控制性要素,是城市空间的基本底色。我国水资源分布不平衡、区域结构性缺水、水污染等问题严峻,制约了城市的发展,亟需以城市为独立研究单元进行全域诊断与推演,对全国的城市水环境和用水特征进行分析并制定策略。本文通过对我国八大综合经济区的369 个城市的水情总体特征以及关键要素时空分布格局进行分析,揭示了我国800 mm等雨量线、降水总量与水资源总量关系的演进规律;从未来推演视角,预测了我国369 个城市2035 年水平衡发展情势;在此基础上,聚焦城市用水需求与水资源供给之间的矛盾,将我国的城市划分为“城渴型”“产旱型”“房淹型”3 类,分别阐述3 类城市的水环境特征和空间分布。最后,本文提出了适应水条件的我国城市发展政策建议,包括“以水定城”的新型城镇化对策、“以水定产”的城市产业发展对策和“以水定人”的城市人口发展对策,以期对我国今后城市发展布局提供参考。

关键词: 水资源;城渴型;产旱型;房淹型;以水定城;水情推演    

Analysis of inventory level under procurement constraints in supply chain

CHANG Guangshu

《机械工程前沿(英文)》 2007年 第2卷 第3期   页码 361-363 doi: 10.1007/s11465-007-0063-1

摘要: Because the inventory is one of the major factors that affect the performance of the supply chain system, efficient reduction of an inventory can effectively reduce the cost level of the total supply chain. Therefore, inventory management is an important means to optimize the operation of a supply chain and enhance the competitive advantage. Considering the (, ) policy in an inventory management, this paper establishes a model of the inventory level. Then, the change of the inventory level with and without the procurement constraints is analyzed, and their expectation and variance calculated. Consequently, the order point can be determined accurately to reduce the inventory level and the operation risk.

关键词: supply     efficient reduction     system     expectation     procurement    

models to explore the solution space of large nonlinear systems underlying flowsheet simulations with constraints

《化学科学与工程前沿(英文)》 2022年 第16卷 第2期   页码 183-197 doi: 10.1007/s11705-021-2073-7

摘要: Flowsheet simulations of chemical processes on an industrial scale require the solution of large systems of nonlinear equations, so that solvability becomes a practical issue. Additional constraints from technical, economic, environmental, and safety considerations may further limit the feasible solution space beyond the convergence requirement. A priori, the design variable domains for which a simulation converges and fulfills the imposed constraints are usually unknown and it can become very time-consuming to distinguish feasible from infeasible design variable choices by simply running the simulation for each choice. To support the exploration of the design variable space for such scenarios, an adaptive sampling technique based on machine learning models has recently been proposed. However, that approach only considers the exploration of the convergent domain and ignores additional constraints. In this paper, we present an improvement which particularly takes the fulfillment of constraints into account. We successfully apply the proposed algorithm to a toy example in up to 20 dimensions and to an industrially relevant flowsheet simulation.

关键词: machine learning     flowsheet simulations     constraints     exploration    

Resilience strategies for sustainable supply chains under budget constraints in the post COVID-19 era

《工程管理前沿(英文)》   页码 143-157 doi: 10.1007/s42524-022-0236-y

摘要: The COVID-19 outbreak has caused uncertainty risk surges, increased sustainable supply chain vulnerabilities, and challenges to sustainable supply chain resilience (SSCR) management. Therefore, improving SSCR is necessary to alleviate vulnerabilities, and SSCR management must generate large capital investments. However, the economic downturn brought about by the COVID-19 epidemic has made some companies have limited budgets that can be used to improve SSCR. Therefore, the design of resilience solutions needs to fully consider the constraints of budgetary costs. Most of the existing related literature only discusses optimal resilience solutions under certain cost constraints, so such resilience solutions cannot be applied to most enterprises. In this study, we set the cost constraint as a variable quantity, using resilience efficiency and customer satisfaction as indicators, to determine the changing laws of optimal resilience strategies when cost constraints change. These rules can be applied to enterprises with different budgeted costs. Our findings suggest that companies should prioritize sacrificing resilience measures (RMs) related to adaptive capacity when budget costs gradually decline, and RMs related to absorptive capacity are indispensable at all budget levels. Furthermore, the pursuit of environmental and social sustainability cannot be abandoned, no matter how limited the flexible budget may be.

关键词: sustainable supply chain     customer requirement     resilience efficiency     customer satisfaction     budget constraint    

emission reduction targets with minimum abatement costs: An enterprise-level allocation method with constraints

《环境科学与工程前沿(英文)》 2022年 第16卷 第2期 doi: 10.1007/s11783-021-1459-6

摘要:

• Quantification of efficiency and fairness of abatement allocation are optimized.

关键词: Pollutant emission reduction allocation     Emission reduction measures     Total abatement cost     Economic efficiency     Abatement space    

Operation and control of flow manufacturing based on constraints management for high-mix/low-volume production

GUAN Zailin, PENG Yunfang, MA Li, ZHANG Chaoyong, LI Peigen

《机械工程前沿(英文)》 2008年 第3卷 第4期   页码 454-461 doi: 10.1007/s11465-008-0083-5

摘要: The existing technology of flow manufacturing, which is mainly appropriate for high volume and repetitive production, is proven difficult to be applied in high-mix/low-volume environments. To adapt lean production into the latter, a new type of flow manufacturing is proposed based on flow path management technology. This paper first describes the general operation framework of the proposed new mode. The main idea is the dynamic formation of adaptable virtual production lines (called flow paths) corresponding to different product families. The application of different theories of constraints/drum-buffer-rope (TOC/DBR) control policies depends on the differences in scope of variety and scale of demand for these product families. The overall architecture of the proposed mechanism of constraint management-based operation and control is introduced. For the implementation, a mathematical programming method is suggested for the dynamic planning of flow paths, and a TOC/DBR ‘path-specific’ mechanism with group scheduling is used for the control over each flow path. We also study other critical issues including the identification and management of resource bottlenecks, and the setting of the buffer size in the deployment of the TOC/DBR mechanism.

关键词: appropriate     management technology     scheduling     technology     different    

Two-stage stochastic programming with robust constraints for the logistics network post-disruption response

《工程管理前沿(英文)》   页码 67-81 doi: 10.1007/s42524-022-0240-2

摘要: Logistics networks (LNs) are essential for the transportation and distribution of goods or services from suppliers to consumers. However, LNs with complex structures are more vulnerable to disruptions due to natural disasters and accidents. To address the LN post-disruption response strategy optimization problem, this study proposes a novel two-stage stochastic programming model with robust delivery time constraints. The proposed model jointly optimizes the new-line-opening and rerouting decisions in the face of uncertain transport demands and transportation times. To enhance the robustness of the response strategy obtained, the conditional value at risk (CVaR) criterion is utilized to reduce the operational risk, and robust constraints based on the scenario-based uncertainty sets are proposed to guarantee the delivery time requirement. An equivalent tractable mixed-integer linear programming reformulation is further derived by linearizing the CVaR objective function and dualizing the infinite number of robust constraints into finite ones. A case study based on the practical operations of the JD LN is conducted to validate the practical significance of the proposed model. A comparison with the rerouting strategy and two benchmark models demonstrates the superiority of the proposed model in terms of operational cost, delivery time, and loading rate.

关键词: logistics network design     post-disruption response strategy     two-stage stochastic programming     conditional value at risk     robust constraint    

Trajectory optimization with constraints for alpine skiers based on multi-phase nonlinear optimal control

Cong-ying Cai, Xiao-lan Yao,yaoxiaolan@bit.edu.cn

《信息与电子工程前沿(英文)》 2020年 第21卷 第10期   页码 1413-1534 doi: 10.1631/FITEE.1900586

摘要: The super giant slalom (Super-G) is a speed event in alpine skiing, in which the skier trajectory has a significant influence on the athletes’ performances. It is a challenging task to determine an for the skiers along the entire course because of the complexity and difficulty in the convergence of the optimization model. In this study, a model for alpine skiers competing in the Super-G is established based on the theory, in which the objective is to minimize the runtime between the starting point and the finish line. The original problem is converted into a multi-phase nonlinear problem solved with a , and the trajectory parameters are optimized to discover the time-. Using carried out by the MATLAB optimization toolbox, the is obtained under several equality and inequality constraints. Simulation results reveal the effectiveness and rationality of the model. A test is carried out to show that our code works properly. In addition, several practical proposals are provided to help alpine skiers improve their training and skiing performance.

Multimodal processes optimization subject to fuzzy operation time constraints: declarative modeling approach

Izabela NIELSEN,Robert WÓJCIK,Grzegorz BOCEWICZ,Zbigniew BANASZAK

《信息与电子工程前沿(英文)》 2016年 第17卷 第4期   页码 338-347 doi: 10.1631/FITEE.1500359

摘要: We present an extension of the resource-constrained multi-product scheduling problem for an automated guided vehicle (AGV) served flow shop, where multiple material handling transport modes provide movement of work pieces between machining centers in the multimodal transportation network (MTN). The multimodal processes behind the multi-product production flow executed in an MTN can be seen as processes realized by using various local periodically functioning processes. The considered network of repetitively acting local transportation modes encompassing MTN’s structure provides a framework for multimodal processes scheduling treated in terms of optimization of the AGVs fleet scheduling problem subject to fuzzy operation time constraints. In the considered case, both production takt and operation execution time are described by imprecise data. The aim of the paper is to present a constraint propagation (CP) driven approach to multi-robot task allocation providing a prompt service to a set of routine queries stated in both direct and reverse way. Illustrative examples taking into account an uncertain specification of robots and workers operation time are provided.

关键词: Automated guided vehicles (AGVs)     Scheduling     Multimodal process     Fuzzy constraints     Optimization    

Use of float consumption rate in resource leveling of construction projects

Atilla DAMCI, Gul POLAT, Firat Dogu AKIN, Harun TURKOGLU

《工程管理前沿(英文)》 2022年 第9卷 第1期   页码 135-147 doi: 10.1007/s42524-020-0118-0

摘要: The management of resources has been claimed to be as important as scheduling methods. Inefficiency in managing resources may bring about severe delays and cost overruns caused by resource shortages in some cases and/or idle resources in others. Therefore, resources should be utilized efficiently to prevent project failures. Resource leveling is one of the approaches that are used for the management of resources. It aims to minimize fluctuations, peaks, and valleys in resource utilization without changing the completion time of a project and the number of resources required. Although the main principle behind traditional resource leveling is achieving an even flow of resources while the original project duration remains unchanged, the literature supports the need to develop an efficient model that discriminates among the activities that are selected for participation in resource leveling. For this purpose, this study has developed a model that considers the float consumption rates of activities in resource leveling. The float consumption rate is the percentage that is set to determine the maximum amount of float which will be consumed to shift the start time of the activity. The proposed model allows a scheduler to assign float consumption rates to each activity that can be used during the resource leveling procedure. When the required information is inputted, the proposed model automatically changes the required daily resources as it shifts the noncritical activities along their available total float times. The proposed model is expected to minimize the likelihood of severe delays and cost overruns. The model is demonstrated by constructing a network and its resource utilization histograms.

关键词: resource management     resource leveling     float consumption rate     scheduling    

Evaluation of a novel Asymmetric Genetic Algorithm to optimize the structural design of 3D regular and irregular steel frames

Mohammad Sadegh ES-HAGHI, Aydin SHISHEGARAN, Timon RABCZUK

《结构与土木工程前沿(英文)》 2020年 第14卷 第5期   页码 1110-1130 doi: 10.1007/s11709-020-0643-2

摘要: We propose a new algorithm, named Asymmetric Genetic Algorithm (AGA), for solving optimization problems of steel frames. The AGA consists of a developed penalty function, which helps to find the best generation of the population. The objective function is to minimize the weight of the whole steel structure under the constraint of ultimate loads defined for structural steel buildings by the American Institute of Steel Construction (AISC). Design variables are the cross-sectional areas of elements (beams and columns) that are selected from the sets of side-flange shape steel sections provided by the AISC. The finite element method (FEM) is utilized for analyzing the behavior of steel frames. A 15-storey three-bay steel planar frame is optimized by AGA in this study, which was previously optimized by algorithms such as Particle Swarm Optimization (PSO), Particle Swarm Optimizer with Passive Congregation (PSOPC), Particle Swarm Ant Colony Optimization (HPSACO), Imperialist Competitive Algorithm (ICA), and Charged System Search (CSS). The results of AGA such as total weight of the structure and number of analyses are compared with the results of these algorithms. AGA performs better in comparison to these algorithms with respect to total weight and number of analyses. In addition, five numerical examples are optimized by AGA, Genetic Algorithm (GA), and optimization modules of SAP2000, and the results of them are compared. The results show that AGA can decrease the time of analyses, the number of analyses, and the total weight of the structure. AGA decreases the total weight of regular and irregular steel frame about 11.1% and 26.4% in comparing with the optimized results of SAP2000, respectively.

关键词: optimization     steel frame     Asymmetric Genetic Algorithm     constraints of ultimate load     constraints of serviceability limits     penalty function    

A literature review of perishable medical resource management

《工程管理前沿(英文)》   页码 710-726 doi: 10.1007/s42524-023-0278-9

摘要: In recent decades, healthcare providers have faced mounting pressure to effectively manage highly perishable and limited medical resources. This article offers a comprehensive review of supply chain management pertaining to such resources, which include transplantable organs and healthcare products. The review encompasses 93 publications from 1990 to 2022, illustrating a discernible upward trajectory in annual publications. The surveyed literature is categorized into three levels: Strategic, tactical, and operational. Key problem attributes and methodologies are analyzed through the assessment of pertinent publications for each problem level. Furthermore, research on service innovation, decision analytics, and supply chain resilience elucidates potential areas for future research.

关键词: perishable medical resources     organ transplant     healthcare products     decision analytics     operations management    

China Launched the First Wastewater Resource Recovery Factory in Yixing

《环境科学与工程前沿(英文)》 2022年 第16卷 第1期 doi: 10.1007/s11783-021-1496-1

The Integration Model of Closed-Loop Supply Chain Resource Allocation Considering Remanufacturing

Xiao-qiu Shi,Yan-yan Li,Wei Long

《工程管理前沿(英文)》 2016年 第3卷 第2期   页码 132-135 doi: 10.15302/J-FEM-2016026

摘要: Logistics resource planning is an integration model of materials requirement planning and distribution resource planning which is a resource allocation technology. It is a technology of satisfying both production material supply and resource allocation optimization which is based on inventory management. For the remanufacturing supply chain, recycling and rebuilding of products form a reverse materials movement loop which challenges the traditional logistics resource planning system. For the characteristics of reverse logistics of remanufacturing supply chain, we propose a closed-loop supply chain resource allocation model based on autonomous multi-entity. We focus on integration resource allocation model of materials requirement planning and distribution resource planning considering remanufacturing.

关键词: remanufacturing     supply chain     reverse logistics     resource allocation     integration model    

标题 作者 时间 类型 操作

Planning projects with scarce resources: Yesterday, today and tomorrow’s research challenges

Mario VANHOUCKE

期刊论文

基于水资源约束的我国城市发展策略研究

吴志强,刘晓畅,刘琦,乔壬路,刘治宇,杨婷,严娟,姬凌云

期刊论文

Analysis of inventory level under procurement constraints in supply chain

CHANG Guangshu

期刊论文

models to explore the solution space of large nonlinear systems underlying flowsheet simulations with constraints

期刊论文

Resilience strategies for sustainable supply chains under budget constraints in the post COVID-19 era

期刊论文

emission reduction targets with minimum abatement costs: An enterprise-level allocation method with constraints

期刊论文

Operation and control of flow manufacturing based on constraints management for high-mix/low-volume production

GUAN Zailin, PENG Yunfang, MA Li, ZHANG Chaoyong, LI Peigen

期刊论文

Two-stage stochastic programming with robust constraints for the logistics network post-disruption response

期刊论文

Trajectory optimization with constraints for alpine skiers based on multi-phase nonlinear optimal control

Cong-ying Cai, Xiao-lan Yao,yaoxiaolan@bit.edu.cn

期刊论文

Multimodal processes optimization subject to fuzzy operation time constraints: declarative modeling approach

Izabela NIELSEN,Robert WÓJCIK,Grzegorz BOCEWICZ,Zbigniew BANASZAK

期刊论文

Use of float consumption rate in resource leveling of construction projects

Atilla DAMCI, Gul POLAT, Firat Dogu AKIN, Harun TURKOGLU

期刊论文

Evaluation of a novel Asymmetric Genetic Algorithm to optimize the structural design of 3D regular and irregular steel frames

Mohammad Sadegh ES-HAGHI, Aydin SHISHEGARAN, Timon RABCZUK

期刊论文

A literature review of perishable medical resource management

期刊论文

China Launched the First Wastewater Resource Recovery Factory in Yixing

期刊论文

The Integration Model of Closed-Loop Supply Chain Resource Allocation Considering Remanufacturing

Xiao-qiu Shi,Yan-yan Li,Wei Long

期刊论文